Rock blasting set on drought-plagued Miss. River
ST. LOUIS – Barge operators along a key stretch of the Mississippi River braced Monday for months of restricted shipping as crews prepared to begin blasting large rock formations that are impeding navigation on the drought-plagued waterway.
Contractors from Iowa and Ohio could begin drilling holes into the troublesome Mississippi River bedrock south of St. Louis and detonating explosives inserted inside as early as today, the Army Corps of Engineers said.
They expect to remove enough rock to fill about 50 dump trucks, possibly more.
Story Archived
Please sign in with your Comment Member ID and password.
Having trouble?
If you have any technical difficulties, either with your username and password or with the payment options, please contact us by e-mail at archivedesk@shawmedia.com









