Fair
67°
Crystal Lake, IL
Fair|Forecast »

D-158 ramps up Huntley High expansion

Text Size: AaAaAaAaAa

(Continued from Page 1)

A $39 million state construction grant is covering the entire $12 million expansion plan, which includes outdoor renovations and building improvements.

“I think the outdoor field is something that could take place right away, where as the design and contracting for the building has a longer time line,” Drzal said. “Everything has an order of events to them.”

||2|Next Page

Reader Poll

Do you feel you are saving enough for retirement?

Yes
No
Already retired