Northwest Herald


Friend's E-mail:
  (maximum of 3 addresses separated by commas)
Your E-mail:
A Brief Comment (150 char max / 25 word max)
Article:

Detour: Fleming Road starting, Walkup Road finishing

• FLEMING ROAD: Work continues to rebuild the 2 1/2-mile stretch of road between Route 120 and Country Club Road. A posted detour reroutes drivers through Woodstock along Routes 120, 47 and 14.

Security image:   
Note:the e-mail sent will contain information, such as your IP address (74.125.19.43), for purposes of tracking abuse. Use of this software to spam or harass individuals can and may result in penalties punishable by law.

[x] Close Window

Copyright © 2014 Northwest Herald. All rights reserved.